Project case

Waterfront, structure and installation.

We made a clever adjustment to a previously completed DBL quay lift with a lifting capacity of kg in Franeker.

The customer was very satisfied with the lift, but due to a rise in the water level, the propeller eventually became partially submerged. – Solution: extended outriggers installed – The lift was readjusted to the correct height – Result: the boat is now completely dry again Another satisfied customer and a great example of our customer-focused service Are you dealing with changing circumstances or have specific questions about an existing installation? We are happy to think along with you and always look for a suitable solution.

Interested? Contact us.

Quote request

Protect your boat to measure.

Interested in a boat shelter or boat lift? Request a quote and use your waterfront location, dimensions and usage as the starting point.