Project Gorinchem

We have installed a custom-made canopy on sustainable HDPE floats for the water police in Gorinchem.

We have installed a custom-made canopy on sustainable HDPE floats for the water police in Gorinchem. Measuring 12 meters long, 4 meters wide and 4 meters high, this construction offers optimal protection against the weather and ensures safe storage of their vessels. The canopy is equipped with an electric roller door for extra use and safety. We do not supply the dock inside, but the entire roof fits in seamlessly with it. Thanks to the robust materials and slim construction, this is a durable and low-maintenance solution.

Recent projects

A selection of projects in the Netherlands and abroad.

Project Dutch Floatlift

For this client, we supplied a Dutch Floatlift system without a canopy, specifically designed for installation within an existing structure. A well-thought-out solution where functionality, load-bearing capacity, and sustainability come together perfectly.

More information

Project Westzaan

In Westzaan, we have installed a DBL quay lift with a lifting capacity of 1200 kg. A powerful and reliable solution that keeps the vessel safely, stably, and dry above the water.

More information